Overview
Quick Details
- Feature:
- Adjustable (height), Convertible
- Specific Use:
- CONSOLE TABLE
- General Use:
- Home Furniture
- Type:
- Living Room Furniture, vintage casual
- Mail packing:
- N
- Application:
- Bathroom, Home Office, Living Room, Bedroom, Hotel
- Design Style:
- Modern
- Material:
- Metal & Wood, MDF
- Appearance:
- Modern
- Place of Origin:
- Fujian, China
- Brand Name:
- Zhuo zhan Furniture
- Model Number:
- EC-0005
- Product name:
- Entryway Table
- Main material:
- Metal, Marble,Glass
- MOQ:
- 500pcs
- Payment term:
- T/T 30% Deposit 70%
Product Name | Entryway Coat Rack |
Material | Metal & Wood, Wood Metal |
Color | White/Gold/Black/ Customized |
Size | 45.6 x 23.8 x 5.7 inches |
MOQ | 300PCS |
Product Recommendation
Production Process
Packing&Transport
FAQ
Quality control
1. IQC, Incoming Quality Control when purchasing raw materials.
2. IPQC: Input Process Quality Control in every procedure.
3. FQC: Finish Quality Control when products were completed.
4. OQC: Outgoing Quality Control before shipping.
5. Quality Tracking and Quality Improve Meeting after shipping.
Payment terms
1. 30% deposit in advance, 70% against copy of BL. Or L/C at sight.
2. For massive order, detailed payment terms can be negotiated accordingly.
Lead time
1. High season (Sept. to Mar.): 35-40days
2. Low Season (Apr. to Jul.): 25-35 days
3. Trial order or sample order can be flexible by prioritizing.
4. A detailed production schedule for each order will be drew up and it is a platform for further communication between customer and us.
1. IQC, Incoming Quality Control when purchasing raw materials.
2. IPQC: Input Process Quality Control in every procedure.
3. FQC: Finish Quality Control when products were completed.
4. OQC: Outgoing Quality Control before shipping.
5. Quality Tracking and Quality Improve Meeting after shipping.
Payment terms
1. 30% deposit in advance, 70% against copy of BL. Or L/C at sight.
2. For massive order, detailed payment terms can be negotiated accordingly.
Lead time
1. High season (Sept. to Mar.): 35-40days
2. Low Season (Apr. to Jul.): 25-35 days
3. Trial order or sample order can be flexible by prioritizing.
4. A detailed production schedule for each order will be drew up and it is a platform for further communication between customer and us.